Securely ground the outer chassis framework to the building’s primary earth system. Inter-Cabinet Bus Logic
Gunnebo speed gates ship in heavy, precision-packed crates. Rough handling can misalign internal drive mechanics before the unit is even powered. Inspection Protocol
Once the cabinets are mechanically secured and wired, attach the glass or acrylic barrier wings. gunnebo speedstile fl installation manual
According to official technical documentation from Gunnebo and partners like Fichet Group : : Bolting Depth : A minimum of 70mm is required. Concrete Resistance : Minimum fckcube 30N/mm² .
Anchor bolt kits (typically M10 or M12 mechanical expansion anchors) Securely ground the outer chassis framework to the
Observe the onboard diagnostic LEDs. The logic controller will perform an automated homing cycle, moving the glass panels through their maximum travel envelopes to map physical end-stops. Adjusting Parameter Settings
Once physical installation is complete, the following checks are necessary before powering up: Anchor bolt kits (typically M10 or M12 mechanical
Walk into the lane from Direction B without an authorization while the lane is idle. The barrier must remain closed, and a loud acoustic alarm should trigger.
Tighten the expansion anchors to the manufacturer's specified torque rating. Re-verify the level after tightening. 5. Electrical Connections and Wiring
A great installation includes teaching. Walk operators through normal operation, emergency procedures, and simple maintenance tasks: cleaning glass and seals, lubrication points, how to reset a jam, and how to recover from a power loss. Deliver a package: as-built drawings, cable schedules, configuration backups, and a spare-parts list.
Two pedestrians attempt to pass on a single badge authorization.